The works relating to the rehabilitation of the Boretto irrigation pumping station were tested.
Misa has replaced 23 electric-pumps, each with capacity of 2500 l/s; these together with the 5 existing electric-pumps give at the pumping station a total capacity of 70 mc/s.
Pipes, MV/LV electrical equipment for an installed power of 8000 kVA, as well as automation and control system, were also supplied.