Realization of the sluice gates and the planks necessary for the intake structure, the interconnection work, the upstream and valley return work as well as the irrigation artifacts.
Supply and installation of:
- no. 1 grid, size 50x6 m
- no. 1 plank assembly in painted steel, size 7,5x3,6 (h) on 5 elements
- no. 4 motorized sluice gates 7,5x2,55 m, 4 sides sealed, hydrostatic head 4,5 m, in AISI 304
- no. 8 motorized sluice gates 3,0x3,0 m, 4 sides sealed, hydrostatic head 6,2 m, in AISI 304
- no. 4 motorized sluice gates 3,0x2,0 m, 4 sides sealed, hydrostatic head 6,2 m, in AISI 304
- no. 3 motorized sluice gates 1,0x1,0 m, 4 sides sealed, hydrostatic head 5,0 m, in AISI 304
- no. 1 clapet 0,8x1,0 m
Supply and installation of remote control system, composed as follows:
- no. 1 supervision control center of the entire retarding basin, which can be remotely controlled.
- no. 6 local peripherals with control sensors for the automation of the sluice gates, interconnected through a fiber optic telematic network
- no. 7 decentralized peripherals, for the acquisition of flow, level and rain data, along the watercourses located in the northern area of Vicenza, interconnected via GPRS/UMTS system