Customer:
Regione del Veneto
Place:
Montecchia di Crosara (VR), Italy
Year:
2018
Description of works:
- no. 1 motorized sluice gate 6,0x2,0 m, 4 sides sealed, hydrostatic head 3,5 m, in painted carbon steel
- no. 1 motorized sluice gate 3,0x1,8 m, 4 sides sealed, hydrostatic head 3,7 m, in painted carbon steel
- no. 2 motorized sluice gates 2,0x1,5 m, 4 sides sealed, hydrostatic head 6,2 m, in painted carbon steel
- no. 3 motorized sluice gates DN 1000, 4 sides sealed, hydrostatic head 6,5 m, in painted carbon steel
- no. 1 motorized sluice gate DN 800, 4 sides sealed, hydrostatic head 3,9 m, in painted carbon steel
- no. 4 LV electrical panels with field connections
- no. 1 system for supervision and remote control
- no. 1 series of hydrometric level measurements
Numbers
935.000 mc volume of reservoir
9000 m of cable installed
10000 kg of carbon steel
Particular notes
The flood of November 2010 put the towns of Soave and Monteforte d'Alpone in serious difficulty. Following the event, the project of the “Colombaretta” rolling basin was born, arranged on two levels and capable of accumulating 935,000 cubic meters
of water deriving from the Alpone torrent.