Customer:
Consorzio di bonifica Medio Astico Bacchiglione (now Consorzio di bonifica Alta Pianura Veneta)
Location:
Montecchio Precalcino (VI), Italy
Year:
2006
Description of works:
- n. 1 Francis turbine with capacity 400 l/s, head 29 m, power 100 kW
- MV/LV electrical equipment for installed power equal to 160 kVA
- 100 m of outlet pipe in cast-iron
- building to house equipment
- turbine protection and by pass hydraulic valves
Nominal characteristics
Total plant capacity: 400 l/s
Head: 29 m
Total installed power: 100 kW
Curiosity...
The hydroelectric power station has been designed and implemented by minimizing the environmental impacts on watercourses, deriving directly from the existing irrigation pipelines already managed by the Client.