Customer:
A.C.A. Pescara
Location:
Pescara (PE), Italy
Year:
2005
Description of works:
- no. 1 Francis turbine with capacity 1000 l/s, head 33 m, power 280 kW
- turbine protection and by-pass hydraulic valves
- MV/LV electrical equipment for a total installed power of 400 kVA
Nominal characteristics
Total plant capacity: 1000 l/s
Head: 33 m
Total absorbed power plant: 280 kW
Curiosity...
The hydroelectric plant is part of a water system designed and built for the purpose of energy saving and recovery of the jump available, at the suggestion of Misa.
In particular, the water that passes through the turbine feeds a water purifier and enters the aqueduct network of the Val Pescara through the adjacent pumping station built by Misa
Request information