Misa has supplied, at the service of the new 1 MW hydroelectric power plant built by another company:
- no. 18 stop-logs 4,2 x 1,4 m, 4 sides sealed, hydrostatic head 5,9 m, in carbon steel S355JR, complete with lifting beam
- no. 1 hydraulic flap gate, 2,40 x 1,90 m, 3 sides sealed, in carbon steel S355JR
- no. 1 hydraulic de-gravel sluice gate 2,77 x 3,30 m, 3 lati sides sealed, in carbon steel S355JR
- no. 6 hydraulic sluice gates-intake structure, 4,0 x 3,5 m, 4 sides sealed, in carbon steel S355JR
- no. 1 hydraulic sluice gate 5,8 x 5,3 m, 4 sides sealed, in carbon steel S355JR
- no. 1 fish ladder
During the same period, Misa also carried out extraordinary maintenance on the "Galileo" sluice gates on the Nervesa della Battaglia river barrier. Find out
more.