Bonzicco-Dignano hydroelectric power plant

Supply and maintenance of no. 1 crossflow turbine

Bonzicco-Dignano hydroelectric power plant

Customer: 

Consorzio di bonifica Pianura Friulana

Place: 

Bonzicco, Dignano (UD),Italy

Year: 

2020

Description of works:

Supply and maintenance of n. 1 crossflow turbine 250 l/s - 9,5 m - 20 kW  equipped with the following accessories:
-  no. 1 adduction pipe DN 500
-  no. 1 synchronous discharge DN250
-  no. 1 hydro valve DN250
-  no. 1 ultrasonic flow meter
-  no. 1 ultrasonic level meter
-  no. 1 LV control switchboard
-  no. 1 automation and control system
-  no. 1 remote control device

The turbine, part of the pumping station of Dignano, use a geodetic head available, managed by the reclamation Consortium.
The turbine was activated only in 2020 after a long procedure carried out in agreement with Enel, with a specific connection to the electric net; agreement in which Misa actively participated.

Nominal characteristics

Total plant capacity: 250 l/s
Head: 9,5 m
Total installed power: 20 kW