Company Logo
Menu
User
Language
Search
Search

MAV, Pierina hydroelectric power plants

Construction of no. 4 hydroelectric power plants (Madonna della Salute, Altivole, Volpago, Maser)

MAV, Pierina hydroelectric power plants

Customer: 

Consorzio di bonifica Piave

Location: 

Madonna della Salute, Altivole, Volpago, Maser (TV), Italy

Year: 

2014

Description of works:

-  no. 1 Banki turbine with capacity 300 l/s, head 29 m, power 80 kW
-  no. 1 Banki turbine with capacity 350 l/s, head 32 m, power 100 kW
-  no. 1 Banki turbine with capacity 300 l/s, head 23 m, power 60 kW
-  no. 1 Banki turbine with capacity 350 l/s, head 32 m, power 100 kW
-  no. 4 adduction pipes DN 500
-  MV/LV electrical equipment for installed power of 340 kVA
-  automation and control systems
-  remote control devices
-  building suitable for the containment of the equipment

Nominal characteristics

Total plants capacity: 1300 l/s
Mean head: 29 m
Total installed power: 340 kW
Request information

Images