Customer:
Consorzio di bonifica Brenta
Location:
Mestrino (PD), Italy
Year:
2013
Description of works:
- n. 1 hydrodynamic screw with capacity 3200 l/s, head 3,4 m, power 110 kW, screw diameter 2800 mm
- n. 1 hydraulic gate 3300x1600
- n. 3 sluice gates with electric actuator 1000x1800
- n. 1 sluice gate with electric actuator 2200x900
- n. 1 electric switchboard
- remote control device
- inlet pipe in reinforced concrete
- technical room externally covered in weathering steel
Nominal characteristics
Total plant capacity: 3200 l/s
Head: 3,4 m
Total absorbed power plant: 110 kW
Curiosity...
The exploitation of the jump of an ancient mill on the river Ceresone has allowed the construction of the hydroelectric power plant, paying particular attention to the speed of construction, as well as to environmental mitigation, through
careful design and executive choices.