Customer:
Comune di Berbenno di Valtellina
Place:
Berbenno di Valtellina (SO), Italy
Year:
2020
Description of works:
- no. 2 vertical electric-pumps, each with capacity 2000 l/s, head 2,75 m, power 90 kW
- no. 2 pipes DN 1000 in stainless steel
- electrical equipment, generating set and accessories
Nominal characteristics
Total plant capacity: 4000 l/s
Head: 2,75 m
Total installed power: 180 kW
Particular notes
The pumping station was built in a very delicate area, at the confluence between Adda river and the Finale stream, subject to flooding.
The purpose of the plant is to defend the town of Berbenno di Valtellina from the floods, which usually occur due to the floods of the Adda river.
Request information