Bagnetto 2 pumping station

Overflow basin for flood containment of the Reno river floods in the locality of Bagnetto

Bagnetto 2 pumping station

Customer: 

Consorzio della bonifica Renana

Place: 

Sala Bolognese (BO), Italy

Year: 

2015

Description of works:

-  no. 1 electric-pump with capacity 1540 l/s, head 9,1 m, power 200 kW
-  no. 1 pipe DN 1000
-  no. 1 slide valve DN 1000 with hydraulic control
-  no. 1 butterfly valve DN 800 with hydraulic control
-  no. 1 butterfly valve DN 1000 with hydraulic control
-  no. 1 hydraulic control unit

Nominal characteristics

Total plant capacity: 1450 l/s
Head: 9,1 m
Total installed power: 200 kW

Curiosity...

The intervention is part of a general project for the construction of a 21 mc/s total plant to replace the existing pumping station.