Company Logo
Menu
User
Language
Search
Search

Zilvara pumping station

Supply and installation of electric pumps and complete electrical system

Zilvara pumping station

Customer: 

Consorzio di bonifica Nord Sardegna

Place: 

Badesi (SS), Italy

Year: 

2018

Description of works:

-  no. 3 electric-pumps each with capacity 400 l/s, head 6,9 m, power 45 kW
-  complete electrical system

Nominal characteristics

Total plant capacity: 1200 l/s - 1,2 mc/s
Head: 6,9 m
Total installed power: 135 kW

Curiosity...

The intervention represents a renewal of the existing pumping station, located at the mouth of the Coghinas river, to defend the coast of the Badesi city.
The machines are activated automatically whenever the river conditions don’t allow the natural runoff of the drains.

Particular notes

The intervention concerned in particular the reconstruction of the pumps, the sluice gates for the natural drainage and all the electrical systems.
The new fully automatic control system normally provide the natural outflow of the drainage channel through the sluice gates and, if necessary, the intervention of the mechanized drainage pumps. All supervised by the remote control center.
Request information

Images