Cassanigo pumping station

Water distribution network of the CER channel. Senio-Lamone area

Cassanigo pumping station

Customer: 

Consorzio di bonifica della Romagna Occidentale

Place: 

Faenza (RA), Italy

Year: 

2008-2009

Description of works:

-  no. 5 electric-pumps (1 as reserve), each with capacity 155 l/s, head 85 m, power 200 kW (irrigation system)
-  no. 3 electric-pumps, each with capacity 400 l/s, head 10,50 m, power 75 kW (booster system pump)
-  no. 1 electric-pump woth capacity 40 l/s, head 85 m, power 55 kW (irrigation system)
-  no. 1 manifold DN 600 
-  no. 1 manifold DN 800 
-  MV/LV electrical equipment for a total installed power of 1260 kVA
-  automation and remote control system
-  no. 1 anti-water hammer device of 16 mc

Nominal characteristics

Total plant capacity: 1860 l/s - 1,86 mc/s
Head: 10,5÷85 m
Total installed power: 1080 kW

Particular notes

The pumping station represents one of the different local distribution systems of the water withdrawn by the CER channel.

Curiosity...

The pumping station is equipped with two sets of pumps, one dedicated as booster system pump and the other dedicated to irrigation distribution.
The operation is completely automatic and monitored by a remote supervision center.