Company Logo
Menu
User
Language
Search
Search

S. Leonardo pumping station

Water distribution network of the CER channel. Ronco-Bevano area

S. Leonardo pumping station

Customer: 

Consorzio di bonifica della Romagna 

Place: 

Forlimpopoli (FC), Italy

Year: 

2008-2009

Description of works:

-  no. 3 electric-pumps, each with capacity 250 l/s, head 22 m, power 90 kW 
-  no. 1 manifold DN 600 
-  MV/LV electrical equipment for a total installed power of 250 kVA
-  automation and remote control system
-  no. 1 anti-water hammer device of 30 mc

Nominal characteristics

Total plant capacity: 750 l/s - 0,75 mc/s
Head: 22 m
Total installed power: 270 kW

Particular notes

The pumps supplied form a booster system of the water withdrawn by the CER channel. The operation is completely automated and monitored by a remote supervision center.

Curiosity...

The pumping station represents one of the different local distribution systems and booster system of the water withdrawn by the CER channel.
Request information

Images