Pumping stations 900 l/s - 1600 l/s

Project Tronco di Acerenza, 3rd lot distribution for irrigation of about 5000 ha

Pumping stations  900 l/s - 1600 l/s

Customer: 

Commissario Straordinario per la realizzazione dello Schema Idrico Basento-Bradano 

Place: 

Genzano di Lucania (PZ), Italy

Year: 

2018

Description of works:

Pumping station 900 l/s 
- no. 4 electric-pumps, each with capacity 300 l/s, head 35 m, power 160 kW
- no. 1 intake manifold DN 800 PN 10 
- no. 1 discharge manifold DN 700 PN 10 
- no. 1 anti-water hammer device of 30 mc
- no. 1 electromagnetic flowmeter DN 450
- no. 2 pressure transmitters
- no. 1 crane 3000 kg
- no. 1 low voltage control switchboard
- no. 4 inverters, each of 160 kW 
- no. 1 medium voltage switchboard
- no. 2 transformers of 500 kVA
- no. 1 automation and remote control system
- no. 1 generating set of 525 kVA

Pumping station 1600 l/s
- n. 5 electric-pumps, each with capacity 400 l/s, head 33 m, power 200 kW
- n. 1 intake manifold DN 1200 PN 10 
- n. 1 discharge manifold DN 1000 PN 10 
- n. 1 anti-water hammer device of 20 mc
- n. 1 electromagnetic flowmeter DN 600
- n. 2 pressure transmitters
- n. 1 crane 3000 kg
- n. 1 low voltage control switchboard
- n. 5 inverters, each of 200 kW
- n. 1 medium voltage switchboard
- n. 2 transformers of 630 kVA
- n. 1 automation and remote control system
- n. 1 generating set of 630 kVA

The project is equipped with the Marascione hydroelectric power plant for a power of 360 kVA.

Nominal characteristics

Overall capacity: 3200 l/s - 3,2 mc/s
Total installed power: 1640 kW

Particular notes

The hydroelectric power plant is part of the envisaged project interventions to complete the water supply line coming from the reservoirs of Genzano and Acerenza and from the Trevigno crossroads, including a first section of irrigation distribution in district B in the Vulture Alto Bradano Reclamation Consortium.
The project involves the realization of:
- a divider with attached piezometric tower at the Genzano reservoir;
- a pressurized hydraulic tunnel with a diameter of 3,200 mm long about 4 km with a maximum capacity of 10.8 mc/sec, which represents the most important work;
- an hydraulic disconnection tank, at the end of the tunnel, with an annexed piezometric tower;
- a guard house;
- adduction pipelines to the 3 compensation tanks of the total volume of 104,000 cubic meters for the sectors B1, B2-B3, B4 of the irrigation area to be served;
- irrigation distribution networks covering a total area of 4,584 ha;
- remote control system.