Company Logo
Menu
User
Language
Search
Search

Retarding basin of Trissino-Tezze

Supply and installation of sluice gates in the retarding basin

Retarding basin of Trissino-Tezze

Customer: 

Consorzio di bonifica Alta Pianura Veneta

Place: 

Trissino-Tezze (VI), Italy

Year: 

2017

Description of works:

Supply and installation of:
-  no. 3 manual sluice gates 1,5x1,5 m, 4 sides sealed, hydrostatic head 7,6 m, in stainless steel AISI 304
-  no. 1 manual sluice gate 1,5x1,0 m, 4 sides sealed, hydrostatic head 4,3 m, in stainless steel AISI 304

Numbers

Volume of reservoir: 2.7 million cubic meters
Construction material: AISI 304
Maximum hydraulic head: 7.5 meters
Hydraulic thrust on each sluice gates: 15000 kg

Particular notes

The equipment is used as intake structure and return structure of the retarding basin of the Agno torrent, to protect the inhabited areas of the valley.
The work was designed and built after the disastrous flood of November 2010.

Curiosity...

Before the realization of the work, a physical model of the system was realized, on a reduced scale, for the purpose of the hydraulic verification of the designed works.
Request information

Images