Customer:
Consorzio di bonifica Piave
Location:
Madonna della Salute, Altivole, Volpago, Maser (TV), Italy
Year:
2014
Description of works:
- no. 1 Banki turbine with capacity 300 l/s, head 29 m, power 80 kW
- no. 1 Banki turbine with capacity 350 l/s, head 32 m, power 100 kW
- no. 1 Banki turbine with capacity 300 l/s, head 23 m, power 60 kW
- no. 1 Banki turbine with capacity 350 l/s, head 32 m, power 100 kW
- no. 4 adduction pipes DN 500
- MV/LV electrical equipment for installed power of 340 kVA
- automation and control systems
- remote control devices
- building suitable for the containment of the equipment
Nominal characteristics
Total plants capacity: 1300 l/s
Mean head: 29 m
Total installed power: 340 kW
Request information